Inspection Projects

R&D Projects

 

Inspection Projects

Scope: Shore-pulling part of both phases on lay-barge
Total length of line in Phase 17: ~4.5 km
Total length of line in Phase 18: ~4.5 km
Line size (OD): 32 inches with a 4 inches Piggyback line
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client: IOEC (Iranian Offshore Engineering and Construction)
Owner: POGC (Pars Oil and Gas Company)
Duration: 15 Days
Status: Finished
More...

Scope: Inspection of 1st stage Separator Vessels for Crack

Reference Standard: ASTM 577 & 578
Total number of vessels: 2
Material: A516 Gr.70 with Inconel cladding
Inspection methods: ToFD, Semi-mechanized PE, PE
Client:
Eni Iran BV
Duration: 20 Days
Status: Finished

Scope: Pipe-laying of both phases on lay-barge
Total length of line in Phase 17: ~102 km
Total length of line in Phase 18: ~109 km
Line size (OD): 32 inches with a 4 inches Piggyback line
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client: IOEC (Iranian Offshore Engineering and Construction)
Owner: POGC (Pars Oil and Gas Company)
Duration: 5 Months
Status: Awarded

  • Sirri to Assaluyeh Pipeline Project

Scope: Pipe-laying on lay-barge
Total length of line: ~282 km
Line size (OD): 32 inches
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client: IOEC (Iranian Offshore Engineering and Construction)
Owner:
Duration: 7 Months
Status: To be started 1st of June

  • Inspection of Spherical legs

Scope: detection and monitoring of corrosion under Fire Proof
No of tanks: 3
Legs per tank: 10
Inspection method: INCOTEST (Pulsed Eddy Current)
Client:
TORC (Tehran Oil Refining Co.)
Duration: 1 Month
Status: Awarded

        Scope: Consultancy service on applicable NDT methods for the internal

                   inspection of crude oil pipelines
        Inspection method: NA
        Client:
OTC (Oil Terminals Company)
        Duration: 6 Months
        Status: Awarded

R&D Projects