Salman Field development Project (EPC3)
Offshore pipe laying project on lay-barge
Total length of line: 29 km
Line size (OD): 30 inches
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client:
IOEC
(Iranian Offshore Engineering and Construction)
Owner:
IOOC (Iran
Offshore Oil Company)
Duration: 1 Month
Status: Finished
More...
South Pars Development Phases 9&10
Offshore pipe laying project on lay-barge
Total length of line in Phase 9: 85 km
Total length of line in Phase 10: 93 km
Line size (OD): 32 inches with a 4 inches Piggyback line
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client:
IOEC
(Iranian Offshore Engineering and Construction)
Owner:
POGC (Pars
Oil and Gas Company)
Duration: 7 Months
Status: Finished
More...
South Pars Development Phases 17&18
Scope: Shore-pulling part of both phases on lay-barge
Total length of line in Phase 17: ~4.5 km
Total length of line in Phase 18: ~4.5 km
Line size (OD): 32 inches with a 4 inches Piggyback line
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client: IOEC (Iranian Offshore Engineering and Construction)
Owner: POGC (Pars Oil and Gas Company)
Duration: 15 Days
Status: Finished
More...
Darquain 2nd Stage Development
Scope: Inspection of 1st stage Separator Vessels for Crack
Reference Standard: ASTM 577 & 578
Total number of vessels: 2
Material: A516 Gr.70 with Inconel cladding
Inspection methods: ToFD, Semi-mechanized PE, PE
Client: Eni Iran BV
Duration: 20 Days
Status: Finished
South Pars Development phases 17&18
Scope: Pipe-laying of both phases on lay-barge
Total length of line in Phase 17: ~102 km
Total length of line in Phase 18: ~109 km
Line size (OD): 32 inches with a 4 inches Piggyback line
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client: IOEC (Iranian Offshore Engineering and Construction)
Owner: POGC (Pars Oil and Gas Company)
Duration: 5 Months
Status: Awarded
Sirri to Assaluyeh Pipeline Project
Scope: Pipe-laying on lay-barge
Total length of line: ~282 km
Line size (OD): 32 inches
Welding method: Automatic welding
Inspection method: AUT (Automated Ultrasonic Testing)
Client: IOEC (Iranian Offshore Engineering and Construction)
Owner:
Duration: 7 Months
Status: To be started 1st of June
Inspection of Spherical legs
Scope: detection and monitoring of corrosion under Fire Proof
No of tanks: 3
Legs per tank: 10
Inspection method: INCOTEST (Pulsed Eddy Current)
Client: TORC (Tehran Oil Refining Co.)
Duration: 1 Month
Status: Awarded
Feasibility and preliminary studies for the internal inspection of subsea SBM and Jetty lines from seashore to Azarpad jetty.
Scope: Consultancy service on applicable NDT methods for the internal
inspection of crude oil pipelines
Inspection method: NA
Client:
OTC
(Oil Terminals Company)
Duration: 6 Months
Status: Awarded
Improvement of UT
Signals by Digital Signal Processing
Scope: Potential applications of
digital signal processing techniques for the
improvement of time resolution and signal-to-noise ratio of
ultrasonic time-of-flight diffraction (TOFD) signals.
Client:
Applus RTD
Duration: 3 Months
Status:
Finished

![]()